TAI Works with City of Woodstock to Complete Multi-Year Infrastructure Upgrades
Trotter and Associates, Inc. has delivered a comprehensive series of municipal infrastructure upgrades in Woodstock, IL, over a multi-year period. These initiatives, focused on street improvements and water main replacements, have impacted 22.2 miles of roadway and represent a total investment of $28.3 million in enhancing public infrastructure and urban development.
2026
City of Woodstock 2026 Street Program
The Trotter and Associates team is currently working closely with the City of Woodstock to determine the scope and streets for the 2026 Street Program. This project will entail road resurfacing and reconstruction, along with sewer repairs, on local roads.
Raffel Road Resurfacing
Trotter and Associates secured IDOT Local Agency Functional Overlay (LAFO) funding to resurface a 1-mile section of Raffel Road. This heavily used local arterial road had not been resurfaced since 2010. TAI worked with the city to complete both Phase 1 and Phase 2, and will complete Phase 3 (construction) in the spring of 2026.
2025
City of Woodstock 2025 Enhanced Street Program
The 2025 Enhanced Street Program was a $8.3 million project that included 9 miles of cement-stabilized and traditional road reconstruction, as well as mill and overlay work on a mix of local arterial, collector, residential, and commercial roads. Associated work included full survey and design of severely deteriorated streets and areas with challenging ADA compliance issues, curb and gutter R&R, sidewalk R&R, landscape restoration, and storm and sanitary evaluation, design, and spot repairs.
City of Woodstock Gould Street Water Main Replacement
The 2025 Gould Street Water Main Replacement was a $1.3 million project which entailed the installation of 1,200 feet of 8” water main and appurtenances, adjacent sanitary and storm sewer repairs and replacements, a complete roadway reconstruction, a mill and overlay of adjoining streets, and full landscape restoration.
2024
City of Woodstock 2024 Enhanced Street Program
The 2024 Enhanced Street Program was a $6.7 million street program that consisted of 6.9 miles of cement-stabilized reconstruction, as well as traditional mill and overlay work on a mix of local arterial, collector, residential, and commercial roads. Associated work included full survey and design of severely deteriorated streets, curb and gutter R&R, sidewalk R&R, landscape restoration, and storm and sanitary evaluation, design, and spot repairs.
City of Woodstock Pleasant Street Water Main Replacement
The 2024 Pleasant Street Water Main Replacement was a $3 million project which entailed the installation of 2,500 feet of 8” water main and appurtenances, 2,300 feet of new storm sewers, a complete roadway and curb and gutter reconstruction with significant changes to the road’s profile and cross-slopes, and a mill and overlay of adjacent streets.
2023
City of Woodstock 2023 Enhanced Street Program
The 2023 Enhanced Street Program was a $6 million program that included 4.5 miles of cement-stabilized reconstruction and traditional mill and overlay work on a mix of rural, residential, collector, and arterial roads. Associated work included the police station parking lot mill and overlay, curb and gutter R&R, sidewalk R&R, storm and sanitary repairs, lead water service replacement, and landscape restoration.
City of Woodstock Lake Avenue Water Main Replacement
The 2023 Lake Avenue Water Main Replacement was a $3 million project, which entailed the installation of 3,200 feet of 16” water main and appurtenances as well as an asphalt overlay on Lake Avenue, a heavily trafficked local arterial road.