Fox River Water Reclamation District (FRWRD) - North and West WRF Structural Repairs

May 14, 2025

Concrete repairs are vital for preserving the integrity of existing structures and enhancing their service life. This was the main objective for the Structural Repairs Project at Fox River Water Reclamation District’s North and West facilities. To meet this objective, the Trotter structural team evaluated numerous buildings, tanks, and components at both facilities to develop a comprehensive repair plan. Repairs ranged from minor crack injection to full-depth concrete repairs, masonry repairs, and improvements to aluminum stairs and guardrails.


Dahme Mechanical Industries (DMI) and its team of subcontractors, Manusos General Contracting, Bulley & Andrews, Alliance Concrete Sawing and Drilling, and A. Horn Inc., are wrapping up the final stages of the project. The remaining scope of work includes regrouting a Final Clarifier and extensive rehabilitation of a concrete structure that dates to the early 1950s.


In addition to the structural components of this project, existing stop plates at the West Facility’s Chlorine Contact Tank were replaced with slide gates, improving operational efficiencies for District Staff. The DMI team effectively and efficiently installed all fourteen gates within a week, allowing District Staff to resume maintenance on their facilities in preparation for the disinfection season.