City of North Chicago – 2020 Metra Parking Lot Resurfacing Program

Oct 27, 2020

Trotter and Associates, Inc. is pleased to announce that the City of North Chicago – 2020 Metra Parking Lot Resurfacing Program was awarded to Chadwick Contracting with a bid that came in under budget with a total of $195,648.50.

The City of North Chicago 2020 Metra Parking Lot Resurfacing Program Project includes the resurfacing of the Metra Parking Lot and Kiss and Ride in the City of North Chicago.  The proposed improvements vary (see Project Location Map and Typical Sections for additional information), but typically include the Hot Mix Asphalt surface removal 4”, placing 1 1/2” of Hot-Mix Asphalt Surface Course, Mix ‘D’, N50, over 2 1/2” of Hot Mix Asphalt Binder Course, IL-19.0, N50, as shown on the typical sections.

The contractor is required to maintain two-way directional flow of traffic on each street throughout construction.  Improvements shall also include Aggregate Base Repair, Combination Concrete Curb and Gutter Removal/Replacement, Sidewalk Removal/Replacement, Paint Pavement Markings, Parkway Restoration; and all other appurtenant work and materials necessary to complete the project in accordance with the plans, standard specifications and Special Provisions.

Share by: