COMPANY CONTACT ADDRESS PHONE NUMBER
Gerardi Sewer James Gerardi 1785 Armitage Court Addison, IL 60101 (630) 519-5116
A Lamp Concrete Contractors, Inc. Kelly Biello 1900 Wright Boulevard, Schaumburg, IL 60193 (847) 891-6000
Berger Joel Avitia 1205 Garland Rd. Wauconda, IL 60084 (847) 514-4442
H Linden and Sons Brooke 722 E South St Unit D Plano, IL 60175 630-552-9955
Holiday Sewer & Water Construction, Inc. Terri Koch 1000 N. Rand Rd., Suite 116, Wauconda, IL 60084 (847) 526-3788
IHC Construction Dayna Boekenhauer 385 Airport Road Ste 100 Elgin 60123 847-841-7770
John Neri Construction Co. Nicholas Neri 770 Factory Road Addison, IL 60101 (630) 629-8384
Acqua Contractors Corp Denise Martinez 551 S IL Route 83, Elmhurst, IL 60126 630-359-4648
Swallow Construction Corp Tammy Dunagan 490 Topsoil Drive, West Chicago, IL 60185 630-512-9900
Dodge Construction Network John Doroy 2860 S. State Hwy 161, Suite 160 #501, Grand Prairie, TX 75052 844-326-3826 ext 9210
J. Congdon Sewer Service, Inc. Carolina Cornejo 170 Alexandra Way, Suite A, Carol Stream, IL 60188 630-510-2434
Constructconnect, Inc. Marcus Harley 3825 Edwards Road, Suite 800, Cincinnati, OH 45209 770-417-4191

Bid Tab

17-Nov-22 Village of Oak Brook - Route 83 and I-88 Water Main Project Engineer's Estimate Engineer's Estimate Swallow Construction Corp. Swallow Construction Corp. John Neri Construction Co., Inc. John Neri Construction Co., Inc. IHC Construction Companies, LLC IHC Construction Companies, LLC Berger Excavating Contractors, Inc. Berger Excavating Contractors, Inc.
Item No. Description Quantity Unit Unit Price Total Unit Price Total Unit Price Total Unit Price Total Unit Price Total
1 WATER MAIN PVC C-900 CERTA-LOK, 12" 1,141 LF $230.00 $262,430.00 $240.00 $273,840.00 $247.00 $281,827.00 $309.00 $352,569.00 $378.00 $431,298.00
2 WATER MAIN PVC C-900, 8" 8 LF $175.00 $1,400.00 $87.00 $696.00 $125.00 $1,000.00 $777.00 $6,216.00 $425.00 $3,400.00
3 FIRE HYDRANT ASSEMBLY 1 EA $7,500.00 $7,500.00 $11,000.00 $11,000.00 $12,500.00 $12,500.00 $15,921.00 $15,921.00 $14,405.00 $14,405.00
4 CONNECTION TO EXISTING WATER MAIN 5 EA $4,000.00 $20,000.00 $6,850.00 $34,250.00 $6,200.00 $31,000.00 $5,664.00 $28,320.00 $13,500.00 $67,500.00
5 GATE VALVE, 12", W/ 5' DIA. VALVE VAULT 3 EA $10,000.00 $30,000.00 $9,500.00 $28,500.00 $10,800.00 $32,400.00 $8,857.00 $26,571.00 $10,950.00 $32,850.00
6 GATE VALVE, 8", W/ 5' DIA. VALVE VAULT 1 EA $7,000.00 $7,000.00 $8,500.00 $8,500.00 $9,600.00 $9,600.00 $7,302.00 $7,302.00 $8,900.00 $8,900.00
7 TRACER WIRE ACCESS BOX 3 EA $1,200.00 $3,600.00 $275.00 $825.00 $300.00 $900.00 $502.00 $1,506.00 $2,000.00 $6,000.00
8 VALVE VAULT REMOVAL 6 EA $800.00 $4,800.00 $300.00 $1,800.00 $1,500.00 $9,000.00 $1,650.00 $9,900.00 $1,500.00 $9,000.00
9 ABANDON EXISTING WATER MAIN 1 LS $5,000.00 $5,000.00 $20,000.00 $20,000.00 $37,500.00 $37,500.00 $4,990.00 $4,990.00 $42,000.00 $42,000.00
10 CATCH BASIN TYPE C, 2' DIA. W/ TYPE 1 LID (CLOSED), REMOVE AND REPLACE 1 EA $2,500.00 $2,500.00 $1,525.00 $1,525.00 $2,400.00 $2,400.00 $10,296.00 $10,296.00 $3,200.00 $3,200.00
11 CATCH BASIN TYPE C, 2' DIA. W/ TYPE 8 GRATE, REMOVE AND REPLACE 1 EA $2,500.00 $2,500.00 $1,250.00 $1,250.00 $2,300.00 $2,300.00 $10,296.00 $10,296.00 $3,200.00 $3,200.00
12 STORM DRAIN, 1'X1', REMOVE AND REPLACE 1 LS $750.00 $750.00 $675.00 $675.00 $400.00 $400.00 $2,634.00 $2,634.00 $1,500.00 $1,500.00
13 STORM SEWER PVC C-900, 8", REMOVE AND REPLACE 102 LF $125.00 $12,750.00 $145.00 $14,790.00 $110.00 $11,220.00 $206.00 $21,012.00 $170.00 $17,340.00
14 METAL FES, 8", REMOVE AND REPLACE 1 EA $900.00 $900.00 $255.00 $255.00 $250.00 $250.00 $1,473.00 $1,473.00 $1,075.00 $1,075.00
15 CHAIN-LINK FENCE, REMOVE AND REPLACE 120 LF $75.00 $9,000.00 $20.00 $2,400.00 $35.00 $4,200.00 $18.50 $2,220.00 $105.00 $12,600.00
16 TOPSOIL, SEEDING, AND EROSION CONTROL BLANKET 668 SY $20.00 $13,360.00 $16.50 $11,022.00 $15.00 $10,020.00 $28.00 $18,704.00 $29.00 $19,372.00
17 CLASS D PATCH, 6" 24 SY $150.00 $3,600.00 $140.00 $3,360.00 $115.00 $2,760.00 $167.00 $4,008.00 $185.00 $4,440.00
18 HMA BIKE PATH, REMOVE AND REPLACE 94 SY $125.00 $11,750.00 $75.00 $7,050.00 $68.00 $6,392.00 $167.00 $15,698.00 $130.00 $12,220.00
19 RIP-RAP, RR-3, REMOVE AND REPLACE 58 SY $125.00 $7,250.00 $95.00 $5,510.00 $85.00 $4,930.00 $113.00 $6,554.00 $105.00 $6,090.00
20 WASHED RIVER ROCK, REMOVE AND REPLACE 6 SY $250.00 $1,500.00 $175.00 $1,050.00 $200.00 $1,200.00 $280.00 $1,680.00 $145.00 $870.00
GRAND TOTAL BID $407,590.00 $428,298.00 $461,799.00 $547,870.00 $697,260.00
PERCENT ABOVE LOW BID - - 7.80% 27.90% 62.80%