Original Advertised Date:  August 13, 2018 
* See addendum for deadline changes

Project managers:  Brandon Thomas

ADVERTISEMENT FOR BIDS

Sealed proposals will be received by the Village of Roselle for the project entitled “Kennedy Lift Station Replacement” until 10:00 AM on Thursday, September 27, 2018 at The Office of Public Works, located at 474 Congress Circle North, Roselle, IL 60172. The sealed bids will be publicly opened and read aloud immediately afterwards in the Office of Public Works, located at 474 Congress Circle, Roselle, IL 60172, on the same date. Sealed bids shall be addressed to the Village of Roselle, Purchasing Agent’s Office, 474 Congress Circle, Roselle, IL 60172 and shall be labeled “Kennedy Lift Station Replacement”.

The procurement will be subject to regulations contained in the Davis-Bacon Act (40 USC 276a through 276a-5) as defined by the United States Department of Labor, the Employment of Illinois Workers on Public Works Act (30 ILCS 570) and DBE Policy per 40 CFR Part 33, as amended. This procurement may also subject to the loan recipient’s policy regarding the increased use of disadvantaged business enterprises. This policy requires all bidders to undertake specified affirmative efforts at least sixteen (16) days prior to bid opening. The policy is contained in the specifications. Bidders are also required to comply with the President’s Executive Order No. 11246, as amended. The requirements for bidders and contractors under this order are explained in 41 CFR 60-4. In addition, this procurement is subject to the “Use of American Iron and Steel” requirements as contained in Section 436 (a) – (f) of the Consolidated Appropriations Act, 2014.

NOTE: The work should be completed in such a way that impacts to the operation of the lift station and need to bypass pump are minimized. Impacts to the neighboring townhouses, retail area and roadways shall be minimized as well.

The proposed improvements consist primarily of the following:

1. Site clearing as needed.
2. Excavation for new manholes, building foundation and wet well.
3. Installation of four (4) new manholes and associated piping.
4. Installation of new control/valve/generator building.
5. Installation of new wet well.
6. Piping connections between existing wet well and new manhole.
7. Connection from the new building to the existing force main.
8. Installation of storm sewer structures and piping
9. Relocation of utilities as required.
10. Demolition of existing lift station dry well, controls and pumps.
11. Demolition of pavement and curb.
12. Pavement replacement and patching as required.
13. Sidewalk and curb replacement as required.
14. Restoration of disturbed areas.
15. Jetting of new and existing piping within the area of work.

The Contract Documents may be inspected and purchased at the following locations.

Trotter and Associates, Inc.
40W201 Wasco Rd. Suite D
St. Charles, Illinois 60175
630/587–0470

Payment for Contract Documents is non–refundable and shall be payable to Trotter and Associates, Inc. in the form of cash, certified check or money order. No partial sets of specifications or drawings will be issued. The non–refundable cost for plans and specifications is $200.00. Addenda will be issued only to plan holders.

Each bid shall be accompanied by a bid bond, bank draft, cashier’s check or certified check payable to the order of the Village of Roselle, Illinois in an amount not less than ten percent (10%) of the amount of the bid, as a guaranty that the bidder will execute the contract, if it is awarded, in conformity with the bid form.
The successful bidder will be required to furnish Performance and Payment Bonds on forms provided in the Specifications and Contract Documents, each in an amount equal to one hundred percent (100%) of the contract sum.

Mandatory Pre–Bid Conference will be held:

On Tuesday, August 28, 2018 at 10:00 AM at the site of the Kennedy Lift Station, located at 795 Plum Grove Road, Roselle, IL 60172. (Southwest of the corner of Plum Grove Road and Nerge Road.
**Bidders/Contractors not attending the Pre-Bid Conference shall have their bids rejected.

The contractor shall pay prevailing wages in accordance with the Davis-Bacon Act (40 USC 276a through 276a-5) as defined by the U.S. Department of Labor, Local Ordinance and the Illinois Department of Labor Prevailing Wages for DuPage and Cook Counties, whichever is greater.
Rates can be obtained online at www.wdol.gov and www.state.il.us/Agency/idol/.

Per the IEPA’s Procedures for Issuing Loans from the Water Pollution Control Revolving Fund Part 365.620, Section b, the Village of Roselle may reserve the right to reject any and/or all bids if it has documented sound business reasons.

Final award of bid shall be contingent on the Village of Roselle receiving financing from the Water Pollution Control Loan Program as administered by the Illinois Environmental Protection Agency. Per the IEPA’s Procedures for Issuing Loans from the Water Pollution Control Revolving Fund Part 365.620, Section b, unless all bids are rejected, award shall be made to the low, responsive, responsible bidder after the bid evaluation has been submitted to the IEPA and written notice of IEPA approval has been received by the Village of Roselle.

Village of Roselle, Illinois
Jeffrey D. O’Dell
Village Administrator

Boller Construction
3045 W Washington Waukegan, IL
847.662.5566

IHC
1500 Executive Drive Elgin, IL
847.841.7839

Bolder Contractors
316 Cary Point Drive Cary, IL
847.236.0785

Berger Excavating
1205 Garland Road Wauconda, IL
847.526.5457

Thieneman Construction
17219 Foundation Pkwy Westfield, IN
317.867.3462

DiMeo Brothers
720 RIchard Lane Elk Grove, IL
847.640.2240

Metropolitan Industries
37 Forestwood Drive Romeoville, IL
815.886.9200

John Burns Construction
17601 Southwest Highway Orland Park, IL
708.326.3406

H.Linden & Sons
722 E. South Street Plano, IL

Archon Construction
563 S. Rte 53 Addison, IL
630.495.0015

Joseph J Henderson
4288 Old Grand Avenue Gurnee, IL
847.244.3222

The Blue Book
800 E Main Street Jefferson Valley, NY
800.431.2584

Dodge Data
4300 Beltway Place Arlington, TX
405.455.1699

Manusos General Contracting
91 Christopher Way Fox Lake, IL
847.973.0600

Manusos General Contracting
$1,834,000

IHC
$2,060,700

DiMeo Brothers
$2,438,536